ENGIN 103 Spring ‘05 ELECTRONIC SYLLABUS
(Will
be updated before every class)
CW,
HW, Logbook grades Project
grades Team
grades
Electronic
Forum (Type password in box#1; your name in box#2 and enter main discussion)
Class |
Date |
Activities |
Design Concepts
|
LabVIEW |
Other Concepts |
|||
|
Do |
Topics |
Read
(DCE) |
Topics |
Read
(LV7.0) |
Topics |
Read |
|
1 |
Jan.
25 |
Team Reg. |
What is Engineering? |
1.1-1.4 |
LabView installation |
1.1-1.4 |
Click left |
|
2 |
Jan.
27 |
TW1; 2 ;
3 INT1; |
Strategies
for searching the Internet |
3.1-3.2; 4.6 |
|
|
Click left |
|
3 |
Presentations |
Preparing for Presentations Teams & Project 0 |
7.1-7.3 |
|
|
Click left |
||
4 |
Feb.
8 |
Project 0 –Part I due |
Team Presentations |
|
|
|
|
Click left |
5 |
Project 0 –Part II
due |
Video Presentations |
|
|
|
Click left |
||
6 |
What is Engineering? |
|
1.5-1.10 |
|
|
|||
7 |
P0
i report due
P0
t report due
P0 webpage due |
2.1-2.5 |
Virtual Instruments |
2.1-2.5 |
Click left |
|||
8 |
3.3 |
Editing and Debugging |
3.1-3.2 |
|
||||
9 |
Feb.
24 |
|
*”Engineering_103_teams”
should read “teams04” |
Click left |
|
|
|
|
10 |
Mar.
1 |
Snow Campus closed |
S-3-126 (3 floor Science) |
|
|
|
|
|
11 |
P1 due |
S-3-126 (3 floor Science) |
|
|
Click left |
|
|
|
12 |
Mar.
8 |
|
Estimation;
Prototyping; Project management |
3.4; 4.1-4.3 |
Circuit
analysis with LabVIEW II SubVIs I |
Click left 4.1-4.3 |
|
|
13 |
Mar.
10 |
Web Page due Logbook due |
Learnings from Pr. 0 & 1 and Intro to Pr.2 |
|
Click left |
Strategies
for problem solving |
Click left |
|
14 |
Mar.
22 |
|
Documentation
as a Design Tool Or Computer as a Design Tool I |
3.3; 4.5-4.7 |
SubVIs II |
4.4-4.7 |
|
|
15 |
Mar.
24 |
|
Computer as a Design Tool II |
4.8-4.11 |
Click left |
|
|
|
16 |
|
Writing Technical Reports |
7.4-7.5 |
Case Structure & Formula Node |
5.4 & 5.6 |
|
|
|
17 |
|
Click left |
|
|
|
|
||
18 |
Apr.
5 |
P2 and |
S-3-126 |
|
|
|
|
|
19 |
Apr.
7 |
|
S-3-126 |
|
Click left |
|
|
|
20 |
Apr.
12 |
Logbook
due Web Page due |
Blank Book PR 2 Digital representation: A/D D/A conversions |
4.12 |
The For Loop & Arrays and Clusters &Waveform Graphs |
5.1; 6.1-6.2; 6.7; 7.2 |
|
|
21 |
|
|
|
Arrays & Bundles & XY Graphs |
6.1; 6.7; 7.3 |
|
||
22 |
Ergonomics |
5.1-5.4 |
Curve Fitting w/ LabVIEW and Multiplot |
11.2 |
|
|
||
23 |
|
Role of Failure in Engineering Design |
6.1-6.3 |
The For Loop & Bundles & Waveform Graphs |
Click left |
|
|
|
24 |
|
Effective Communication I |
7.1-7.3 |
The For Loop & Bundles & Waveform Graphs &
SubVIs |
Click left |
|
|
|
25 |
Effective Communication II |
7.4-7.7 |
C. Project rules |
|
|
|
||
26 |
May
3 |
Algorithm & Project due |
Project 3 “Competition” S-3-126 (in class) |
|
Sample
file with five frequency components (Right click, Save as) |
|
|
|
27 |
May
5 |
|
Project 3 “Competition” S-3-126 (in class) |
|
|
|
|
|
28 |
Web page due Logbook due |
|
|
|
|
|
|
|
29 |
May
19 |
|
Final exam in S-3-126 |
|
|
-Bring in Logbook |
20% of grade |
DCE=Design Concepts for Engineers 2ed LV7.0=
LabVIEW Student Edition 7.0
*P=Project **PR=Progress Report
©
Tomas Materdey, 2000-2005