Engineering 103 –UMass Boston
CW 5
(In-Class-Work
5)
1.- Import the data (metal distance and
ultrasonic response) from http://www.itl.nist.gov/div898/handbook/pmd/section6/pmd631.htm
into Excel (it helps to save them into a text file and then use ‘Data/Get
External Data/Import text file’ with the ‘fixed width’ option). Produce a non-linear
fit of the ultrasonic response Y’ as a function of the metal distance X, with model
Y’=exp(-b1*X)/(b2+b3*X). When importing data, note that in that website, the
ultrasonic response (Y)
appears in the first column, and the metal distance (X) in the
second column. Plot the data and best fit on a same plot. Then copy the plot
into a Word file. Also provide b1, b2, b3, and the final ‘standard’ deviation
coefficient.
2.- In the same Word file, estimate the
cost to paint a computer (use flat surface approximation; $5.00/liter; 1
liter=0.001 m3;
1 mil=0.025 mm) Include sketches of your computer.
click here to submit the zipped Word file. Remember it
should be named ‘cw5_yourlastname’
*Remember
that this is an individual work (turn it in, as instructed, with your name and
date). Home-works and class-works count 20% toward the course grade.
Class-works are done in class.