Engineering 103  -UMass Boston

CW 2

(Class Work #2)

 

1)      Why do we have cycles in engineering design? Draw a flow chart with four most important steps in an engineering design cycle.

2)      Draw a flow chart for an in-out system. Label the input and output variables as X and Y, respectively, and explain what are they for at least two simple systems based on gravity. Given a value for an input X, is it possible to determine exactly the value of the output, yes or no, explain why.

In each team, students working together at a computer numbered between 1 and 10 will submit file cw2_XX_a.html and folder cw2_XX_a_files,  students working at a computer numbered between 11 and 20  will submit file cw2_XX_b.html and folder cw2_XX_b_files, to the files folder in the server. Replace XX by 01 if team 1, etc. Include your names within the files.

 

*Remember that this is an individual work (turn it in, as instructed, with your name and date). Home-works and class-works count 20% toward the course grade. Class-works are done in class.