Engineering 103  -UMass Boston

CW 1

(Class Work #1)

 

Use boxes and arrows in MS Word to create a flow chart to show the supply chain of an automobile from the raw materials to the end consumer. The chain should include at least 6 steps: 1) Raw materials 2)_____ 3)_____ 4)_____ 5)_____ 6) Consumer. In each step, indicate what type of engineers from the table below would be involved. In a few words explain what they do specifically. Can you include all ten fields in the supply chain? Save the file as a webpage (see rules for naming the file below), and upload them to the files folder using ftp.

Engineering fields

Abbreviations

Aeronautical and Aerospace Engineering

AAE

Biomedical Engineering

BME

Chemical Engineering

ChE

Civil Engineering

CiE

Computer Engineering

CE

Electrical Engineering

EE

Geological/Geophysical Engineering

GGP

Industrial and Manufacturing Engineering

IME

Material Science Engineering

MSE

Mechanical Engineering

ME

In each team, students working together at a computer numbered between 1 and 10 will submit file cw1_XX_a.html and folder cw1_XX_a_files,  students working at a computer numbered between 11 and 20  will submit file cw1_XX_b.html and folder cw1_XX_b_files, to the files folder in the server. Replace XX by 01 if team 1, etc. Include your name within the files.

 

*Remember that this is an individual work (turn it in, as instructed, with your name and date). Home-works and class-works count 20% toward the course grade. Class-works are done in class.